Shop All Planner & Notebook Supplies | Cloth & Paper – Page 5
Skip to content
/

All

Everything you need to build a planner you love, all in one place. Browse our full shop including inserts, dividers, dashboards, covers, and accessories for discbound, ring, and notebook planners. Whether you are starting from scratch or adding to an existing setup, this is where to find it.

Sort by

658 products

Digital mockup of insert in A5. Insert in use inside a leather planner.

Quad Checklist Planner Inserts

From $12.00 USD

Cloth and Paper

NEW
COLORS

Kolo Tino Ballpoint Pen in Anodized Aluminum Verdant, a deep forest green barrel with gold top button, retracted, angled view Hand writing with a Kolo Tino ballpoint pen in the color Acrylic Sunny.

Kolo Tino Ballpoint Pen

From $150.00 USD

11 colors available

NEW
COLORS

Kolo Tino Fountain Pen in Anodized Aluminum Verdant, a deep forest green barrel with gold accents and silver medium nib shown capped, full pen angled view A hand writing on paper with the Kolo Tino Fountain pen in raw brass.

Kolo Tino Fountain Pen

From $150.00 USD

11 colors available

Leather bag displayed on a neutral background. Color shown is Alhambra.
Valencia Bag in the color Alhambra with accessories and a woman placing a spiral notebook inside the bag

The Valencia Bag

$320.00 USD

5 colors available

Perfect Bound Notebook Cover Set in Blurred Line and Punched Holes, A5, cover shown on a perfect bound notebook The Precision Notebook | A5 closed, showing the cover cut all the way through in the Precision letter pattern over a light layer beneath

Perfect Bound Notebook Cover Set

From $12.00 USD

4 colors available

Weekly Graph Inserts with rows for every day of the week and a blank and graph style column. Detailed view of the weekly layout page for the Weekly Graph Inserts.

Weekly Graph Inserts

From $12.00 USD

Cloth and Paper

White Ephemera Planner Dashboard with transparent pocket and journaling card shown pre-punched for A5 6-ring planners. Ephemera Planner Dashboard showing other Cloth & Paper products inside the transparent pocket.

Ephemera Planner Dashboard

From $10.00 USD

Cloth and Paper

NEW

Set of three mini magnetic bookmarks in Saffron (orange), Dirty Chai (salmon), and Aspen (white) folded in half Saffron (orange) mini magnetic bookmark folded in half

Mini Magnetic Bookmarks | Saffron, Dirty Chai, Aspen

$18.00 USD

Cloth and Paper

Beige genuine leather woven leather folio sized for CP Petite and A6 planners. Woman holding a small, large, and HP Classic woven planner cover in the colors blue, beige, and brown.

Woven Leather Folio Cover | CP Petite

$220.00 USD

3 colors available

Beige genuine leather woven leather folio sized for HP Mini and Personal Wide planners. Woman holding a small, large, and HP Classic woven planner cover in the colors blue, beige, and brown.

Woven Leather Folio Cover | Small

$240.00 USD

3 colors available

Dark brown genuine leather woven leather folio sized for Half Letter and A5 planners. Woman holding a large and HP Classic sized woven planner cover.

Woven Leather Folio Cover | Large

$260.00 USD

3 colors available

Blue genuine leather woven leather folio sized for HP Classic planners. Woman holding a small, large, and HP Classic woven planner cover in the colors blue, beige, and brown.

Woven Leather Folio Cover | HP Classic

$280.00 USD

3 colors available

Full set of six pocket folders fanned out on a neutral background. A5 Spiral folder in use inside a lined notebook

Diagonal Pocket Folder Set

From $6.00 USD

Cloth and Paper

Mineral White Kaweco Art Sport Fountain Pen shown posted Mineral White Kaweco Art Sport Fountain Pen shown disassembled

Kaweco Art Sport Fountain Pen

$140.00 USD

2 colors available

Sage green Lumos Pro Single Tip Pen diagonally, uncapped, with nib set and ink resevoir. Collection of Lumos Pro Pens in a brass finish showing writing samples on paper with each nib size.

Tom’s Studio Lumos Pro Pen

From $75.00 USD

3 colors available

Card holder displayed on a neutral background. Size shown is CP Petite. Credit card holders in use inside a black leather folio. Size shown is CP Petite.

Crystal Clear Credit Card Holder

From $4.00 USD

Cloth and Paper

A5 Editorial Vellum Dividers Vol. 2 displayed flat on a neutral background. A5 Editorial Vellum Dividers Vol. 2 shown in a ring-bound planner with translucent layering.

Editorial Vellum Dividers | Vol. 2

From $14.00 USD

Cloth and Paper

Digital mockup of inserts in A5. Insert in use inside a black leather planner.

Purchase Tracker Inserts

From $12.00 USD

Cloth and Paper

Kaweco Classic Sport Rollerball Pen, Red, Cloth and Paper. Pen displayed on a neutral background. The pen's nib is exposed. Closeup of pen nib.

Kaweco Classic Sport Rollerball Pen

$28.00 USD

4 colors available

Set of clear photo corner stickers displayed on a neutral background. Clear photo corner stickers in use, shown holding a photograph of tennis balls inside a notebook.

Photo Corner Sticker Set

$10.00 USD

Cloth and Paper

Monthly overview large sticky notes set shown side-by-side in size A5 Detail view of the calendar monthly overview large sticky notes with stickers and handwritten notes applied

Large Sticky Note Set | Monthly Overview

From $16.00 USD

Cloth and Paper

Digital mockup of Habit Fold Out Planner Insert in A5 Fully open Habits Fold Out Planner Insert in A5 size inside a ring planner, displaying a grid layout filled with green spotlight stickers and handwritten tasks.

Habits Fold Out Planner Insert

From $10.00 USD

Cloth and Paper

Digital mockup of insert in A5 sizing. Undated Horizontal Weekly Inserts in use inside a black leather planner.

Undated Horizontal Weekly Inserts | Refreshed Layout

From $12.00 USD

Cloth and Paper

One page of Monthly Graph Planner Inserts in size A5 with graph note style calendar and a lined notes section. Close up of the Monthly Graph Planner Inserts showing a calendar view of the month with graph note style interior.

Monthly Graph Planner Inserts

From $18.00 USD

Cloth and Paper

NEW

Folio Cover in black tinted vinyl, CP Petite (CP Petite 6-Disc Punch), closed with a black bungee cord hooked to a black clip Folio Cover in black tinted vinyl, CP Petite (CP Petite 6-Disc Punch), open flat showing the punched disc strip and the black bungee cord inside

Folio Cover | Tinted Vinyl | CP Petite

$27.00 USD

Cloth and Paper

NEW

Travel Notebook Charms set of three including SPOTLIGHT charm in deep orange enamel, FORMA charm in embossed silver metal, and ARROW charm in translucent white plastic Travel Notebook Charms close-up on travel notebook exterior band showing SPOTLIGHT in deep orange enamel, FORMA in silver metal, and ARROW in translucent white plastic

Travel Notebook Charms

$16.00 USD

Cloth and Paper

Digital mockup of insert in A5 sizing. Insert in use inside a black leather planner.

Weekly Schedule Planner Inserts | Monday Start

From $12.00 USD

Cloth and Paper

NEW

Bibliophile Notebook Pocket, black cover printed with scattered white letters Bibliophile Notebook Pocket, open to a blank reading log spread, title, author and start date at the top and a lined facing page

Bibliophile Notebook | Pocket

$25.00 USD

Cloth and Paper

Black Intuition Ultra Thin Planner Cover + Dashboard Set in size A5 6-Ring Punch Intuition Ultra Thin Planner Cover + Dashboard Set shown in use

Intuition Ultra Thin Planner Cover + Dashboard Set

From $20.00 USD

Cloth and Paper

Four unique sheets of transparent label stickers with black text on the topics of lifestyle, financial, essentials, and time. Label Stickers | Text shown resting on a wooden table.

Label Stickers | Text

$9.00 USD

Cloth and Paper

A minimal meeting notes insert with structured sections for subject, agenda, attendees, follow-up, and a gridded notes area. Clean white design with subtle grey lines and three binder punches on the left. A meeting notes insert filled in with handwritten text, featuring sections for subject, agenda, attendees, follow-up, and a gridded notes area. The page rests in a black leather planner.

Extended Meeting Notes Planner Inserts

From $12.00 USD

Cloth and Paper

NEW

The vellum base layer of the A5 6-Ring Punch Strips Planner Dashboard Duo laid flat, showing a greyscale photograph of a stack of books sliced into vertical strips and offset Both layers of the A5 6-Ring Punch Strips Planner Dashboard Duo overlapping, the clear plastic top layer of silhouettes in motion set across the vellum base layer of stacked books

Strips Planner Dashboard Duo

From $10.00 USD

Cloth and Paper

Colorblock Sticky Note Set in Matcha and Dirty Chai, two edge painted square sticky note pads Colorblock Sticky Note Set in Matcha and Dirty Chai, edge painted square sticky note pads

Colorblock Sticky Note Set

$18.00 USD

2 colors available

Artnic Stamp Ink Pad in white seen from above with cover on Row of ten Artnic Stamp Ink Pads in assorted colors, arranged side by side with clear lids displaying the color names.

Artnic Stamp Ink Pads

$4.00 USD

23 colors available

Full set of six Kuretake ZIG Clean Color Dot Markers in Mild Smoky colors shown in original retail packaging. Set of six Kuretake ZIG Clean Color Dot Markers displayed vertically with caps on, showcasing pastel marker colors.

Kuretake ZIG Clean Color Dot Marker | Mild Smoky Set

$14.00 USD

1 color available

A5 vellum dividers shown on a grey background. Close up view of the tabs on A5 vellum dividers.

Vellum Side Tab Planner Dividers | Monthly

From $26.00 USD

2 colors available

All

Everything you need to build a planner you love, all in one place. Browse our full shop including inserts, dividers, dashboards, covers, and accessories for discbound, ring, and notebook planners. Whether you are starting from scratch or adding to an existing setup, this is where to find it.